Tuesday, September 23, 2008

Bottom plate joined to the braces


DTM Term 3 Week 10

This week I have begun on riveting my braces onto the sides of my box so that the walls can be joined on as soon as they have all been joined together. I am doing it in this order as it is more conveinient.

Tuesday, September 16, 2008

DTM Term 3 Week 9

This week I changed the size of my braces that hold the top panel to the walls to 20mm x 20mm, and I have also drilled out all of the holes to put rivets in. Problems encountered were that my holes were not drilled in the same places on every brace, so I redone every braces again with each of them being identical

DTM Term 3 Week 8

Mock exam week

DTM Term 3 Week 7

This week I cut out quite a lot of braces and also my walls (four triangles) and base of the box. There were 4 braces to connect each of the walls to the base, and 4 braces to hold each wall to each other. There were also 4 braces to hold each wall to the top panel. I have decided to use a substance called polymorph for the roofing of the box